The Pendik Municipality Service Building is the first municipal service building project in Istanbul with seismic isolators. The reinforced concrete structure has been designed to incorporate a seismic isolation system. TİS Teknolojik İzolatör Sistemleri A.Ş. overtook the design, production, and installation of the earthquake isolators constituting the seismic isolation system of the project. The construction is ongoing. Details regarding the isolators are provided below.

Name of the produced devices

TİS Double Pendulum (TDP)

Project year

2023

Total number of devices

79 (Str: 73+ Prototype: 6)

Displacement capacity of the devices

±800 mm

Load bearing capacity of the devices

9200/ 13500/ 15000/ 20400/ 21100/ 24500 kN