Sottova Di Stazione is a bridge project located in Italy. TİS Teknolojik İzolatör Sistemleri A.Ş. overtook the design and production of earthquake isolators that will constitute the seismic isolation system. The production of TDP earthquake isolators has been completed by TİS Teknolojik İzolatör Sistemleri A.Ş. Information about the isolation system and isolators is provided below.
Name of the produced devices | TİS Single Pendulum (TSP) |
Project year | 2023 |
Total number of devices | 10 |
Displacement capacity of the devices | ±185 mm |
Load bearing capacity of the devices | 1600 kN |