Abdi İpekçi Sport Complex is a project that invested by Ministry of Environment, Urbanism and Climate Change. The building, which has a steel load bearing system, has been designed as a seismically isolated above the roof level. TİS Teknolojik İzolatör Sistemleri A.Ş. overtook the design and production of the seismic base isolators that will form the seismic isolation system of the structure with reinforced concrete load carrying system. Information about the isolation system and its isolators is given below.

Name of the produced devices

TİS Double Pendulum (TDP)

Project year

2022

Total number of devices

46

Displacement capacity of the devices

±500 mm

Load bearing capacity of the devices

1800 / 4000 kN