Tenaglia is a steel bridge project in Molise. TİS Teknolojik İzolatör Sistemleri A.Ş. overtook the design and production of the seismic base isolators that will form the seismic isolation system of the structure. Information about the isolation system and its isolators is given below.
Name of the produced devices |
TİS Double Pendulum (TDP) |
Project year |
2022 |
Total number of devices |
4 |
Displacement capacity of the devices |
±250 mm |
Load bearing capacity of the devices |
10000 kN |