Osmaniye State Hospital is a 600-bed state hospital that will be in service in Osmaniye. The contractor of the project is Gürbağ Grup, while the project is funded by Ministry of Health. The hospital building, which has a reinforced concrete load carrying system, has been designed as a seismically base-isolated structure and the superstructure has been isolated at the foundation level against earthquake effects. The seismic isolators have been designed, manufactured and installed by TİS Teknolojik İzolatör Sistemleri A.Ş. Information about the project and isolation system is presented at the table below.

Name of the produced devices TİS Double Pendulum (TDP)
Project year 2020
Total number of devices551 (Str: 541 + Prototype: 10)
Displacement capacity of the devices± 450 mm
Load bearing capacity of the devices4300 / 6900 / 10400 / 13900 / 19000 kN