Osmaniye Duzici State Hospital is a 200-bed hospital that will be in service in Osmaniye. The contractor of the project is Kemal Construction, while the project is funded by Ministry of Health. The hospital building, which has a reinforced concrete load carrying system, has been designed as a seismically base-isolated structure and the superstructure has been isolated at the foundation level against earthquake effects. The seismic isolators have been designed, manufactured, and installed by TİS Teknolojik İzolatör Sistemleri A.Ş. Information about the project and isolation system is presented at the table below.

Name of the produced devices

TİS Double Pendulum (TDP)

Project year

2021

Total number of devices

206 (Str: 200, Prototype: 6)

Displacement capacity of the devices

± 590 mm

Load bearing capacity of the devices

5300 / 8600 / 12300 kN