Kütahya Integrated Health Campus is a 500-bed PPP hospital that is located in Kütahya. The
building, which has a reinforced concrete load bearing system, has been designed as a
seismically base-isolated system and superstructure has been isolated at the foundation level
against earthquake effects. The seismic isolators have been designed, manufactured, and
installed by TİS Teknolojik İzolatör Sistemleri A.Ş. The construction of the hospital is being
conducted by Güriş Holding (Dumlupınar Health Services). Information about the project and
isolation system is presented at the table below.
Name of the produced devices | TİS Double Pendulum (TDP) | |
Project year | 2018 | |
Total number of devices | 506 (Str: 498 + Prototype: 8) | |
Displacement capacity of the devices | ± 560 mm | |
Load bearing capacity of the devices | 5000 / 8300 / 11600 / 15300 kN |