Kahramanmaraş Maternity Hospital is a 300-bed hospital project, invested by the Ministry of Health. TİS Teknolojik İzolatör Sistemleri A.Ş. overtook the design and production of the seismic base isolators that will form the seismic isolation system of the structure with reinforced concrete load carrying system. The seismic isolators have been designed and manufactured by TİS Teknolojik İzolatör Sistemleri A.Ş. Information about the isolation system and its isolators is given below.

Name of the produced devices

TİS Double Pendulum (TDP)

Project year

2022

Total number of devices

369 (Yapı: 361, Prototip: 8)

Displacement capacity of the devices

±1000 mm

Load bearing capacity of the devices

5300 / 7500 / 10600 / 17200 kN